Lay out wedi subliner dry and flex and cut to size with a cutter or scissors.
Wedi subliner dry ok for heat mat.
Tile hole saws core router bits.
Can be used on hot water underfloor heating.
Moisture exposure class a0 as per the zdb data sheet.
Large format tile tools.
Step 1 draw ducts grooves onto the wedi building board for installation of the heating system.
Start to finish time lapse schluter bathroom kerdi line linear drain ditra heat large format tile.
Wedi leak proof mold proof tile backerboards and shower systems.
Thin layer crack bridging sealing web manufactured from highly tear resistant polyethylene film which offers optimum connection to tile laying materials thanks to its dual sided special fleece lamination.
Wedi subliner flex isolation mat roll crack bridging decoupling membrane made from stable reinforcing fabric that ensures excellent adhesion of tile setting compounds thanks to its special fleece layer on each side.
Step 2 cut grooves using the router.
Cutting depth should be at least 3 mm deeper.
Wedi 320 on the prepared underground with a 4 or 6 mm grooved trowel.
Sal diblasi 2 897 722 views.
Radiant floor heating wire.
Water vapour retardant.
Strong adhesion of wedi laying materials.
Tile spacers wedges.
Insert wedi subliner dry with the printed side facing upwards and press on with a rubber roller or wooden float.
Radiant floor heating mats.
The fleece mats must overlap 2 at all joints.
For quick sealing measures for fixed date building sites in combination with ceramic tiles and slabs as well as with natural cast tiles for indoor wall and floor areas.
This includes but is not limited to.
Wedi subliner dry features.
Domestic bathrooms hotel bathrooms.
Grout tile cleaning tools.
Cutting width should be the same as the pipe width.